EnOB Monitoring
Energiewendebauen

EnOB Monitoring - Energy-optimized construction: redevelopment of Detmold Vocational College into a plus-energy school.

Laufzeit
-
Projektleitung

The aim of the project is to analyse and optimize the operation of the Detmold Vocational College, which has been redeveloped into a plus-energy school, in terms of comfort and energy consumption based on measurements within the scope of the EnOB intensive monitoring.

The metering and monitoring concept includes the documentation of consumption as well as operating data for the understanding and continuous optimization of the school operation, but places a special focus on a dedicated monitoring of two classrooms, in which indoor climates and operating modes are compared with thermodynamic simulations. This pursues the goal of analysing the potential of low-tech measures in school building concepts. The systems and control algorithms which are needed in schools to provide comfort, how they can be compensated for by alternative, resource-efficient and low-tech economic measures, and how much user responsibility is reasonable for the students and teachers are being investigated. Particular emphasis is placed on the identification of potentials and limitations of passive measures in school buildings, which are redeveloped in accordance with the passive house requirements.

 

Project partners

pape oder semke ARCHITEKTURBÜRO
Bergische Universität Wuppertal
Ingenieurbüro Schmitz
Kreis Lippe

Project request

Privacy policy

Yes, I have read the Privacy Policy note and I consent that the data provided by me, including the contact data, for the processing of the inquiry and in case of questions are electronically collected and stored. My data will only be used strictly for my request and will not be passed without my consent. This consent can be revoked any time with effect for the future.'

Image CAPTCHA
Enter the characters shown in the image.

Other active projects

MonoCab OWL: Development and demonstration of Mono-Cabs

Laufzeit
-

MonoCabs - Small shuttles using the two rails of reactivated railroad lines in both directions. On demand, they run...

Projektleitung
Projektbeteiligung

STIM - Smart transformers as the power supply of the future for industrial mechanical engineering

Laufzeit
-

The aim of the project is to investigate the possible replacement of classic 50 Hz transformers by power electronic...

Projektleitung

Mobility centers of the future - development of a guideline for a multimodal hub

Laufzeit
-

Due to an increasing heterogeneity of the demand for mobility (e.g. intermodality, multimodality, "use instead of...

Projektleitung
Projektbeteiligung

3D-MC2B - 3D- Circuit board construction using polymer coatings on metal substrates and laser direct structuring for compact power electronics applications

Laufzeit
-

The project deals with individually configurable circuit carriers and the resulting possibilities to place highly...

Projektleitung